The HVAC system installation work was done for the medicinal mushroom medium production facility in Muju-gun, Republic of Korea. As a seed production plant, a clean aseptic system was completed, and it was divided into a general area and a clean area based on the high pressure sterilizer. Raw material storage warehouse, material warehouse, medium mixing room, machine room, and sealing room were arranged as general areas, and cooling room, inoculation room, laboratory, culture room, and low temperature storage warehouse were arranged as aseptic and clean areas. We have the technology and experience to completely design HVACR facilities from design to construction in various types of mushroom medium production plants.
2. Hydroponics facility construction
We built a vertical farm for Korean ginseng hydroponics in Oksan Industrial Complex, Chungcheongbuk-do, Republic of Korea. A vertical farm was constructed using sandwich panels on the roof of a 1000㎡ factory building, 6-level beds were installed inside, and HVACR facilities were constructed. A spray-on nutrient solution supply facility and a soil cultivation bed using sterilized culture soil for ginseng were installed, and a drip irrigation method using a drip hose was also installed separately.
4. Greenhouse heating facility construction
An agricultural electric heater for greenhouse heating was installed at a herb farm in Gangnam-gu, Seoul, Korea. Edible herbs are produced in the city center and supplied to hotels, and it is also famous as a place for experiential learning for children, students, and the general public. The planting area is about 10,000㎡, and the auxiliary facilities such as tea pillow ornaments using herbs, exhibition facilities, education centers, etc. are designed to be useful. A warm air fan was also installed on a farm of about 20,000㎡ in Gwangju, Gyeonggi-do, and it was built as an integrated remote control smart farm system.